Town of Wallkill Top banner with photo of JohnWard


Home Page

TOW Bulletin Board
Latest Town Information

Agencies

List of Agencies
Local Government
Master Plan
Planning Board
Town Officials
Services
Ambulance Corps
Forms
Fire Departments
Libraries
Police Department
Points of Interest
Schools
Links
Wallkill Information

Agendas & Minutes
Wallkill History
Election Districts & Places of Voting
Current Information
Golf Club
Recreation
Organizations/Churches Water Quality Survey
Town Code

Contact Us
E-mail Information

W. Abt: I'm the Architect for Carmine Rotundo for Auto Lovers on Route 211 East. When we were last in here before we hadn't gone to the Zoning Board for variances that are required for this project. It's a small parcel on the corner of Route 211 East and Ebert Road and Mr. Rotundo is proposing to build a twelve hundred square foot building to tint auto glass. He down that now in Middletown and that's what he is proposing to do here. He applied for a number of variances with the Zoning Board of Appeals. They were granted last Fall and he proceeded with plans for the project and to the Department of Transportation for approval. The project is oriented to Route 211. Typically they want you to enter up a secondary road if you can but Route 211 has a turning lane across the front of this property and it's the commercial Route 211 that is the advantageous or appropriate entrance for this building and project. Ebert Road is at a higher elevation and it's primarily residential. At first the State had a little concern. They asked us for a drainage study because the outlet of the property is the storm water sewer in Route 211. The State evaluated the entrance for the project and basically determined that they would accept a driveway here because of the turning lane on Route 211. It extends the site distance in this direction. We are continuing with Dick at work sessions. Since then I've had a couple of reviews back from the State and basically have required us to show the driveway where it is. Relative to the storm drains, they required a drainage study which was submitted which of course the intent to keep the after construction runoff at the same rate as the present runoff from the site. In order to achieve that we have two detention systems. A small detention area on the side and we have some trench structures under the parking to retain drainage that comes off the parking lot from the site. The drainage comes now from this area to the parking lot enters the catch basins on both sides of the driveway and with the containment construction that's under the pavement and would eventually flow into the storm drainage in the street. At a higher elevation there's a surface detention area in here that picks up drainage around the back of the building. The State has accepted that relative to their storm drains. I haven't given you a drawing of the building because it's a rather small and little bit complicated building. This is the model that we've been working on to show if we develop the building. It would be a relatively small building about twenty two feet high. It would be a metal building.

A. Dulgarian: But that's set down in too, correct?

W. Abt: Well, it's set above the street. From Ebert you would be seeing this side where the corner is clipped because of the setback. This building would have a stucco finish on the lower level and metal panels on the bottom wrapping around the building. The landscaping that's shown on this plan, some of it is to screen the building from the residential area of Ebert Road and the property on this side and some of it is to make the property more attractive from Route 211. If the State will allow us to, we will do more planting in their right-of-way which is pretty extensive in the front of the building. Typically they don't want that. We have comments dated the 12th.

D. McGoey: You don't have to go through these individually. Do you have any problems with any of them?

W. Abt: No.

G. Lake: I will go through the Board.

A. Dulgarian: Initially I thought this project or the property was a little too small but the Zoning Board gave them variances and the engineer has done a lot of work and I like the project. I'm familiar with the applicant. I know he works a nice clean operation. I don't have a problem other than Dick's comments.


P. Owen: I don't have any comments.

R. Carr: On the drainage, how does it drain into the right-of-way, under the pavement?

W. Abt: Yes.

R. Carr: How does it get out of there?

W. Abt: It's a fairly common type of construction where there are chambers under the pavement that fill up with water and then there is a restricted outlet to it so that the outflow is limited so it takes a while for the water to flow out.

R. Carr: My only other comment is to recommend landscaping between Ebert and some of the residential area is.

G. Monaco: I would like also to see more landscaping separating the residential area if at all possible.

R. Carr: One other thing, did the Zoning variance expire?

W. Abt: No we had it renewed. The last renewal was July 9th.
G. Lake: I agree. I know the gentleman's operation. It is a nice, clean operation. We do have some comments from the fire department. I don't know if you want to address them or not.

W. Abt: I will address them in writing to you.

G. Lake: Do you know where the nearest fire hydrant is?

W. Abt: Yes. The hydrant is shown on the plan is the opposite side of the street and it's shown on the smaller scale survey that shows the entire street. There is a hydrant directly across the building.

G. Lake: How about Ebert Road? Is there any up on Ebert Road any place?

W. Abt: Up the road a little ways, maybe I can indicate the distance from the site.


G. Lake: Access to the rear of the building. You do have access to the front. The dumpster, can you, just so if they did have to get to the back could you slide that some place?

W. Abt: Well, they're concerned about the entrance on Route 211. This is the most viable entrance on the project. The Department of Transportation has basically endorsed it. The entrance off of here is really not viable to the site.

G. Lake: Right.

W. Abt: There is a hydrant directly across and is shown on the smaller scale plan. I will check and see about Ebert Road. I believe there is one up the street a way. No access identified to the rear of this building. There would be just walking access. We don't plan to pave the back of the building. This is a very small building.

G. Lake: The dumpster?

W. Abt: The dumpster is here.

C. Rotundo: That's the best for everyone's concern.

W. Abt: The dumpster would be emptied at off hours.

G. Lake: How many cars do you have at a time?

C. Rotundo: I do about five a day. They come every two hours.

D. McGoey: Can we put a sign there, employee parking for that spot.

C. Rotundo: Yes, I think so.

G. Lake: That might keep everybody happy and the easiest way to solve that.

W. Abt: I think for the size one entrance, certainly that's all they're going to permit on Route 211 and the grading of Ebert Road and it's so small.

G. Lake: Anything else from the Board?

A. Dulgarian: It is a good use for that property rather than it sitting vacant.


MOTION for a NEGATIVE DECLARATION made by P. Owen and seconded by R. Carr.

A. Dulgarian: Aye

P. Owen: Aye

R. Carr: Aye

G. Monaco: Aye

G. Lake: Aye

Motion carried. 5 AYES

MOTION for SITE PLAN/SPECIAL USE PERMIT subject to all comments made by A. Dulgarian and seconded by R. Carr.

A. Dulgarian: Aye

P. Owen: Aye

R. Carr: Aye

G. Monaco: Aye

G. Lake: Aye

Motion carried. 5 AYES


1. VALLEY VIEW PARK - SITE PLAN/SPECIAL USE PERMIT - Route 211 East (46-1-72) #063-000


J. Jacobowitz: We're here on behalf of the applicant. I think I should give you a little history to refresh everybody's recollections. This is an existing park off of Route 211. The folks who own it now have over the years been improving it considerably and they were before you with a revision to the site plan for the purpose of eliminating two streets and two units and replacing the two streets with a single street and then making the lots larger. The result was they would lose two spaces. All the parcels on both sides of the new road would be larger and that would allow improved units to be placed on these lots. On the wall is the proposed new layout with the single street and the units on both sides that are larger lots and are more conforming to the law than the previous plan was which was non-conforming. The plans have been approved by the Orange County Department of Health for water and that's by letter dated September 5, 2002 and that should have gotten its way to the Town. I don't know if Dick ended up getting copies of that.

D. McGoey: I didn't see it.

J. Jacobowitz: The SPEEDS Permit was issued by the Department of Environmental Conservation and that permit was issued August 27, 2002 and that was also should have found it's way here. If it hasn't we will make sure that you get it. That's the good news and the last item is the Department of Health letter of September 10, 2002 which was the approval of the sewerage collection system and that approval is also in writing. All of the utility approvals have been issued for the property based on the plan which is the revised site plan. Mr. Goldberg provided the Town with fifteen sets of the proposed final plan that reflects what ever the comments were over the review period and there is a review letter from Dick that is September 12th. Verify SPEEDS Permit which we are in a position to do because we have it in writing. The second was to satisfy the Orange County Health approval. I've identified both of those letters of approval, water and sewer and made those part of the record. Really, all of these things have been taken care of. Where we are is that we're in a position really to secure the final approval. There is one issue and that is whether you're in position to give final approval tonight. You do not need to have a Public Hearing for the final approval but the Preliminary Approval expired. Under your legislation there is a provision that allows an extension to be granted in cases of proven hardship. Our hardship is that the regulatory offices took a long time to process all the applications for the water and sewer. It was beyond our control. It's not something that we can do anything about except wait patiently and as a result of patient waiting the approvals have been forthcoming and they just have been received.

G. Lake: When did you receive Preliminary Approval?

D. McGoey: They received Preliminary in January 2001.

G. Lake: You've been in all this time trying to get your SPEEDS Permit and your Health Department.


H. Goldberg: Yes. The applications were going back and forth several times.

G. Lake: Didn't you ask the Town for sewer?

H. Goldberg: That's a separate issue.

G. Lake: That doesn't have anything to do with this project?

H. Goldberg: No.

G. Lake: Basically this entire time you're telling us since you've gotten your Preliminary Approval, you've been involved in trying to get your permits done.

H. Goldberg: Yes.

G. Barone: You have diligently pursued getting these approvals through the regulatory agencies?

J. Bushco: There was testing that had to be done, laboratory tests, etc.

G. Barone: You didn't put this on the back burner but kept moving ahead trying to get through the process.

J. Bushco: Yes.

D. McGoey: Six months. They are sitting on these applications. I can understand why it took so long.

G. Lake: You're our experts and you're telling us . . .

D. McGoey: Yes.

G. Lake: That this could have very well been the case.

D. McGoey: No question.

G. Lake: We have the right, Mr. Barone, to as a Board to say we accept that as a hardship or not?

G. Barone: Correct.

G. Lake: I will poll the Board.

A. Dulgarian: I have no problem with that.

P. Owen: I will follow their advice.

R. Carr: No problem.

G. Monaco: I will have to agree with counsel.

G. Lake: I agree with that. So, according to the ordinance we can extend that Preliminary Approval then?

G. Barone: Make a motion to extend the Preliminary Approval pursuant to Section 249-40 of the Town of Wallkill Code.

MOTION to extend PRELIMINARY APPROVAL pursuant to Section 249-40 of the Town of Wallkill Code made by A. Dulgarian and seconded by P. Owen.

A. Dulgarian: Aye

P. Owen: Aye

R. Carr: Aye

G. Monaco: Aye

G. Lake: Aye

Motion carried. 5 AYES

MOTION for SITE PLAN/SPECIAL USE PERMIT subject to all comments made by G. Monaco and seconded by P. Owen.

A. Dulgarian: Aye


P. Owen: Aye

R. Carr: Aye

G. Monaco: Aye

G. Lake: Aye

Motion carried. 5 AYES


2. WALLKILL MANOR APARTMENTS - SITE PLAN/SPECIAL USE PERMIT - Silver Lake Scotchtown Road (50-1-1.2, 51-12-2) #051-002

A. Fusco: I am a Professional Engineer. I'm representing Wallkill Manor. This is a thirty three acre site which is located on the north side of Silver Lake Scotchtown Road. We're proposing to use Second Avenue as an access into the site. We're proposing one hundred and four apartment units. These would be rentals. In addition to that there will be forty one bedroom, two bedrooms will be sixty four for a total of one hundred and four units. What we're proposing is market rent garden apartments. This had received some form of approval many years ago. Mr. Silverman is the Architect on the project. As you can see he's done some elevations, etc. The site does have some wetlands in it. It's been delineated on the map. The site is to be served with municipal water and sewer. There are water and sewer immediately adjacent to the site. In fact there is a sanitary sewer easement through the site. As you can there's also Orange & Rockland and telephone right-of-ways through there. We do have a letter from Orange & Rockland which accepts this plan and concept in relationship to their right-of-ways. Again, as I did state we did have wetlands and they have been delineated. In addition to that there would be a crossing of the wetland. Basically it's approximately six tenths of an acre that would be affected. We have made application to the United States Army Corps of Engineers and we are proceeding with that permit hopefully. In addition to that we've received some comments just recently from Mr. McGoey's office. We have no problem with any of those comments. The letter that I did give to the Chairman and to Mr. McGoey basically outlines our concurrence with all of his comments.

G. Lake: You did change this around a little bit, the buildings were lined up?


A. Fusco: It hasn't been changed since the last submittal or formal maps. What we did do is originally we had a few work sessions with Mr. McGoey, we did have a little more linear look to it. He had requested that we try to come up with a couple different alternatives. We were assisted in trying to give the look a more comfortable look in an apartment dwelling situation. We are a little bit limited on the site because we do have a considerable amount of wetlands. We did have to put the units basically where we did not have wetlands. There are elevation changes as you can see. It's not really a linear project because there are different elevations in the project you can see by the grades. We have utilized the thirty foot road way which enters into the property in order to allow proper ingress and egress out of the property. We've tried to keep the front of the buildings clear from parking. There was a suggestion by the fire department, I believe it was Mr. Cummings who made that suggestion. We were actually able to accommodate that. With do have the adequate number of parking spaces. In fact we exceed that. In addition to that there is another project that is directly east of this. I spoke with Mrs. Potter just recently with Lanc & Tully. We're swapping information and we do plan on a joint emergency access between the properties. That access will be paved for up to the property line by each of the respective projects and details will be shown. We're also showing an emergency access out to Overhill Road, actually more at Sunrise but we are showing that access there so there will be two emergency access points as well as an extra large road way into the property. We are hoping with the utilities to loop the water and sewer through the Kambro project. We have not actually discussed that with them at this point. It would be to their advantage and our advantage for water quality to enable to use that and allow for proper fire protection. As I stated we do have public sewer immediately available. We are moving forward with all aspects of the project. We are also in a position to make improvements to Second Street